A Makassar office furniture supplier that imports directly from the Chinese factory removes one layer of distributor margin — but the route to South Sulawesi is different from Java. Almost all cargo from Foshan arrives by transshipment, and feeder schedules decide whether a fit-out project lands on time. This guide covers the route, cost components, indicative FOB prices and specifications for offices in Makassar and Eastern Indonesia.
Data is compiled by Foshan BG Office Furniture Co., Ltd. (USCC 91440606MA4UKCYD6A, founded 2015, 10,000 m² Bureau Veritas-audited factory, exports to 50+ countries, 300+ containers per year). We manufacture executive desks, workstations, filing cabinets and meeting tables, with regular shipments to Jakarta, Surabaya, Medan, Balikpapan and Makassar.
Why offices in Makassar buy direct from the factory
Office furniture prices in Makassar are built from three layers: factory price (FOB), logistics, and local distributor margin. For a project of 40–120 units, buying direct moves the last two layers into the project budget. The gap we usually see when comparing distributor quotations is 25–40% of the retail price, depending on category and volume.
Volume, not unit count, decides efficiency. A 20ft container carries roughly 26–29 CBM effective — about 120–150 knock-down staff desks or 30 four-person workstations. Below 15 CBM, LCL through a Surabaya consolidator is cheaper. Above 15 CBM, FCL is almost always more economical per unit because freight, THC and documentation are paid once.
Route and timing: Foshan to Makassar
Makassar is the cargo gateway for Sulawesi, Maluku and part of Papua. Vessels from South China usually transship in Singapore or Port Klang before berthing at Makassar's container terminal; some cargo is split at Tanjung Perak first. Sailing time is therefore 3–6 days longer than the direct Jakarta route.
| Stage | Time | Note |
|---|---|---|
| Production after PO and colour approval | 25–35 days | Add 5–7 days for custom colours or sizes |
| Booking and stuffing | 3–7 days | Feeder schedules are less frequent than Java routes |
| Sailing Foshan → Makassar | 12–18 days | Transshipment via Singapore or Port Klang |
| Customs clearance (Form E, PIB) | 2–5 working days | Faster when documents are ready before berthing |
| Trucking port → office | 1 day | Within Makassar; outlying areas add 2–5 days |
| Unloading and assembly | 2–4 days | Depends on unit count and installation crew |
Total from PO to installed furniture: 7–9 weeks for Makassar, about one week longer than an equivalent Jakarta project. Port-by-port detail is in our China–Indonesia transit time guide.
Cost: from FOB to landed cost in Makassar
The factory price excludes the components below. All figures are indicative and move with season and carrier.
| Component | Range | Basis |
|---|---|---|
| Ocean freight 40HQ Foshan → Makassar | USD 1,800–3,400 | Transshipment; higher than the direct Jakarta route |
| Cargo insurance | 0.3–0.5% of CIF | USD 25,000 container ≈ USD 75–125 premium |
| Import duty HS 9403 | 0% with ACFTA Form E | Without Form E, MFN duty can reach 15% |
| Import VAT | 11% | Calculated on customs value plus duty |
| Import income tax (PPh 22) | 2.5% with an API licence | Higher without an API |
| THC, customs broker and trucking | USD 450–1,100 | Higher outside Java because of feeder vessels |
Example: a container with FOB value USD 25,000 shipped with Form E. Duty is 0%, VAT around USD 2,750, PPh 22 around USD 625, and freight plus port costs USD 2,500–4,500. Landed cost at a Makassar warehouse lands at roughly USD 31,000–32,900, about 24–32% above FOB. The full breakdown is in our landed cost guide.
Indicative FOB prices for Makassar projects
The table uses FOB unit prices at container volume, standard finish and knock-down packing. The lower end applies to larger orders or plain colours; the upper end to bigger sizes, wood finishes or extra accessories.
| Item | Standard specification | CBM/unit | FOB/unit |
|---|---|---|---|
| Staff desk 1200 × 600 mm | 18 mm melamine top, powder-coated steel legs | 0.18–0.22 | USD 38–52 |
| Four-person bench workstation | 2400 mm module, fabric screens, cable tray | 0.60–0.80 | USD 210–290 |
| Executive desk 1800 × 900 mm | 25 mm top, modesty panel, optional side cabinet | 0.45–0.55 | USD 180–260 |
| Meeting table 2400 × 1100 mm | Seats 8, 25 mm top, panel legs | 0.25–0.32 | USD 210–310 |
| Four-door filing cabinet 1600 mm | 1600 × 400 × 2000 mm, 4 shelves, lock | 0.30–0.40 | USD 120–170 |
| Staff task chair | Mesh back, gas lift, no headrest | 0.15–0.20 | USD 18–35 |
| Manager chair | Mesh or synthetic leather, high back | 0.15–0.20 | USD 55–100 |
Unit prices drop 5–12% once a single model passes 50 pcs, and drop further when several models share one production batch because material is purchased together. For mixed containers, the most common Indonesian importer mix is 60% desks and workstations, 25% filing cabinets and 15% chairs. Order conditions are in our MOQ and mixed container guide.
Specifications for Sulawesi's coastal climate
Makassar sits on the coastline with 75–85% humidity and salt-laden air. The same furniture is not equally suited to a ground-floor office near the port and a tenth-floor office with central air conditioning. Four adjustments are worth requesting:
- HMR or E0 MDF with fully sealed edges. Unsealed cut edges absorb moisture and become the starting point for panel swelling.
- Powder-coated steel frames, not wet paint. Powder coating resists moisture, salt and scratches better than spray paint.
- Anti-corrosion hardware. Stainless or galvanised drawer runners, hinges and screws; nickel-plated locks last longer in salty air.
- Packing for a longer journey. Corner protectors, wooden pallets and stretch film. For cargo forwarded to Manado or Ambon, add wooden boards along the panel faces.
For executive desks and director rooms, a 25 mm top is the safe standard. For staff desks, 18–25 mm is sufficient provided the frame and modesty panel are rigid. Finish options are compared in our HPL, melamine and veneer guide.
Project segments that request quotations most often
Demand from South Sulawesi and nearby provinces comes from five project types:
- Provincial and district government offices — staff desks, filing cabinets and meeting tables in large quantities, usually against a standard technical specification.
- Universities and schools — lecturer desks, teacher desks, laboratory workstations and bookcases.
- Bank branches and multifinance — teller counters, service desks and small meeting tables for new branches.
- Hospitals and clinics — registration desks, medical record counters and lockable filing cabinets.
- Mining, energy and construction companies — furniture for project offices and site offices, including desk, chair and document storage packages.
For locations outside the city — Kendari, Palu, Manado, Ambon or Sorong — cargo is usually consolidated in Makassar first and forwarded by feeder vessel. Consolidating several suppliers into one container also reduces cost; the method is explained in our import consolidation guide.
Worked example: a 60-person office in Makassar
Simulation for a company office in the Panakkukang area: 60 staff, 6 managers, one 8-person meeting room and a reception desk.
| Item | Qty | Total CBM | FOB value |
|---|---|---|---|
| Four-person bench workstation | 12 | 8.40 | USD 3,000 |
| Staff desk 1200 mm | 12 | 2.40 | USD 540 |
| Executive desk 1800 mm | 6 | 3.00 | USD 1,320 |
| Meeting table 2400 mm | 1 | 0.29 | USD 260 |
| Four-door filing cabinet | 14 | 4.90 | USD 2,030 |
| Staff task chair | 60 | 10.80 | USD 1,560 |
| Manager chair | 6 | 1.08 | USD 450 |
| Reception desk 2400 mm | 1 | 0.60 | USD 220 |
| Total | 112 | 31.47 | USD 9,380 |
At 31.5 CBM the shipment exceeds the effective capacity of a 20ft container (26–29 CBM), so the choice is a 40HQ or LCL. A 40HQ at 64–68 CBM effective still leaves room for fast-moving stock: extra filing cabinets or staff desks for expansion. The products used in this simulation are in the workstation, executive desk and filing cabinet categories.
How to choose a supplier for Eastern Indonesia
- The supplier ships FOB Shenzhen or Nansha and names the forwarder, rather than quoting CIF with no breakdown.
- Form E and HS codes appear in the quotation, not after the PO.
- There is evidence of experience with ports outside Java — ask for container numbers or stuffing photos from previous shipments, without customer data.
- The packing list states CBM per model, so trucking and feeder costs can be calculated before arrival.
- A written 5-year structural warranty and spare parts availability: drawer runners, locks, hinges and desk legs.
Java route comparisons are in our Surabaya import guide and the Bandung via Tanjung Priok guide.
Frequently asked questions
How long does shipping from China to Makassar take?
About 12–18 days of sailing from Foshan, plus 25–35 days of production. Total from PO to installed furniture is 7–9 weeks.
Can you deliver to Manado, Palu or Ambon?
Yes. Cargo is consolidated in Makassar and forwarded by feeder vessel, adding 3–7 days depending on schedule.
What is the minimum order for a container?
There is no minimum unit count. Cost efficiency starts at 15–18 CBM, and one mixed container may combine several product categories.
Do prices include duty and assembly?
Quoted prices are FOB or CIF and exclude duty, VAT and assembly. With the ACFTA Form E, import duty for HS 9403 is 0%.
For offices in Makassar and Eastern Indonesia, send your floor plan, unit list and target installation date through the contact page. Our team prepares FOB/CIF quotations with CBM calculations, a production schedule and a landed cost simulation. The full catalogue is on the products page, or write to sales001@fsbige.com / Tel/WeChat +86-18928562556.